Spec Setting and Stability Analysis using JMP (0.5 days)

Details Price Qty
Spec Setting and Stability Analysis using JMPshow details + $595.00 (USD)   Sold Out

"Spec Setting and Stability Analysis using JMP (0.5 days)" is currently sold out.
Please check back again later, as spots may become available.

  • Spec Setting and Stability Analysis using JMP
     December 19, 2024
     1:00 pm - 4:30 pm Your Timezone

Spec Setting and Stability Analysis using JMP (0.5 days): This course provides instruction on how to use JMP statistical software for setting specifications and stability analysis including degradation analysis using the Arrhenius acceleration factor.

Spec Setting and Stability Analysis using JMP Objectives:

  • know the recommended approaches for setting specifications
  • be able to calculate the range, a reference interval, and tolerance interval
  • understand how to adjust a reference interval to account for small sample sizes
  • understand the purpose of a stability study
  • know the need to evaluate stability dat
  • understand the importance for a test of poolability of batches
  • be able to use Analysis of Covariance (ANCOVA) is used to evaluate stability data
  • be able to use JMP to determine expiries based upon the criteria outlined in the ICH guidance on
    evaluation of stability data
  • understand the need for accelerated degradation analysis
  • be able to fit a nonlinear function using the Arrhenius acceleration factor

Outline:

1. Setting Specifications
• Min, Max Intervals
• Reference Intervals – Normal Distribution
• Reference Intervals – Non-Normal Distribution (Self Study)
• Tolerance Interval
• Adjusted Reference Intervals for Small Sample Sizes

2. Stability Analysis
• Purpose of stability analysis
• Setting expiries – Situation 1
• Setting expiries – Situation 2
• Setting expiries – Situation 3
• Evaluating accelerated degradation analysis using the Arrhenius acceleration factor
• Evaluating stability for non-linear degradation (self study)

Schedule This Course

Learn more about scheduling Spec Setting and Stability Analysis using JMP (0.5 days) at your location.

Name(Required)